Execution of the Main Buildings near the existing train station and of the New Intermodal Station of Campanhã, with a total construction area of about 80 000m2. This project includes steel structures, reinforced concrete structures and prestressed concrete structures as requested by the demanding functional needs of a large intermodal station. Services Provided: Structural Design and Technical Assistance. Owner: Refer. Time for Completion: 24 months. Cost Estimate: 14 000 000€.