Strong structural intervention in a recent 15 levels building accomplishing the objective of changing it’s functionality from private usage to a public hotel. As well as the demolition of two slabs and the relocation of the main shear walls along all levels, it was also necessary a generalised structural reinforcement intervention. Services Provided: Final Design and Technical Assistance. Owner: Bensaúde Group. Cost Estimate: 1 000 000€.