Remodeling and strengthening of three existing buildings with an area of 12.500m2 and a structure consisting of stone masonry and precast slabs, through the application of shotcrete in the vertical elements and a steel structure in the floors. Execution of two new reinforced concrete buildings and steel structure exterior galleries, with a total area of 9.400m2. Services Provided: Final Design and Technical Assistance. Owner: Parque Escolar EPE. Time for Completion: 24 Months. Cost Estimate: 2 500 000€.