Projects of access to dams, restoration of EN216, EN217 and EN315 and resettlement of several paths, a total length of 50km. It includes the design of 5 bridges and viaducts and retaining structures and slope stabilization. Preliminary Study for Tender, Basic Design, Detail Design and Technical Assistance to the Works.