Railway line projects in sections 6 and 7 of the Nacala Corridor, between Malawi and the Nacala. The following projects spread over a total length of 570Kms (108Km of new line) were developed: 10 realignments with a total length of new line of 52.4Km; 15 Crossing-Loops with a total length of new line of 38Km 7 Re-routings in existing stations (Cuamba, Malema, Cais de Riane, Ribaue, Anchillo, Nacavala and Namialo), a total length of 18Km Specialties: Project coordination, Layout, Permanent Way, Earthworks, Structures and Bridges