Project Design of all the specialties of Architecture and Engineering involved in the undertaking of the Sanctuary Transfer, namely the Access, Parking, Enclosure, Hostel (Pilgrims House), Bar/Restaurant (Hermit House), Support Building and Museum (House of Miracles), Sanitary Facilities and Various Buildings. It also includes the water catchment, the water treatment plant, the water tank, the supply network and also the wastewater treatment plant. This project is part of the damage minimization measures provided within the scope of the Baixo Sabor Hydroelectric Undertaking. Total Area of the Enclosure: 5 300m2. Total Area of Construction: 1 800m2. Parking Spaces: 443. Services Provided: Licensing Design; Final Design; Technical Assistance to the Works. Owner: EDP – Gestão da Produção de Energia, SA.