Structural design of water treatment and supply systems of the new centrality of Kuito, designed to serve a population of about 40.000 inhabitants. This system comprises: Water supply center with a water tower 30 meters high and a ground reservoir with a capacity of 7000 m3, both in reinforced concrete. Water Treatment Plant composed by several reinforced concrete components. Wastewater Treatment Plant composed by several reinforced concrete components, including 2 ground reservoirs with a capacity of 4000 m3 each. Services Provided: Final Design and Technical Assistance. Owner: Kora Angola. Time for completion: 24 Months. Cost Estimate: 100 000 000€.