Projects for a public tender of 9 viaducts, 98 overpasses/underpasses and 4 bridges to be built by the cantilever method: Bridge over the River Douro, with a total length of 1090m and 150m spans; Bridge over the River Sabor (Moncorvo), with a total length of 300m and 115m spans; Bridge over the River Sabor (Bragança), with a total length of 520m and 127m spans; Bridge over the River Fervença, with a total length of 487m and 127m spans. Owner: Estradas de Portugal, S.A.