Railway bridge built within the scope of the Duplication of Minho Railway. The bridge has a total length of 96.5m, with a prestressed concrete deck, wich was precast in the construction site and incrementally launched by hydraulic jacking. Services Provided: Preliminary Study, Final Design and Technical Assistance. Owner: REFER, EPE.