Slender building in Estoril with a reinforced concrete structure containing 4 levels of flat slabs. The steeply sloping and the limitation of the lot made it necessary to provide an anchored peripheral retaining structure. Services Provided: Design and Technical Assistance. Owner: Regino Cruz, Arquitectos. Time for Completion: 12 months. Cost Estimate: 400 000€.