Construction area of 130 000m2 for sales, parking and storage, executed with steel structures and cast-in-place reinforced concrete structures. The solution with the greatest impact is a precast 16mx8m mesh. This option allowed the costs control and the minimization of the execution time. The Mall structure was completely cast-in-place, with a beam-and-slab structural solution, with 16m span prestressed beams and a steel ceiling with span lengths of about 35m. Services Provided: Design and Technical Assistance. Owner: IKEA. Time for Completion: 16 months. Cost Estimate: 12 000 000€.