Execution of several new buildings with an area of about 16 500m2, integrated in the Park of Materials and Workshops (PMO) in Ceira, namely one administrative building with four levels and one workshop building with double ceiling height and prestressed concrete beams with span lengths of 16m, whose coverage serves as a parking area. There is a small viaduct connecting the two buildings, providing car access to them. Services Provided: Final Design and Technical Assistance. Owner: Metro do Mondego. Time for Completion: 24 Months. Cost Estimate: 4 800 000€.