Project Design of all the specialties involved in the undertaking of the Centre for Environmental Interpretation and Animal Rescue currently being built in Felgar, within the scope of the Baixo Sabor Hydroelectric Undertaking. The project includes two buildings with a total construction area of 600m2 and located within an intervention area of about 1Ha, which includes rest areas for animals, fences and flight tunnels. One of the buildings consists of a Veterinary Hospital. Services Provided: Licensing Design; Final Design; Technical Assistance to the Works. Owner: EDP – Gestão da Produção de Energia, SA.