Remodelation and strengthening of two existing buildings with an area of 8.000 m2 and a structure consisting of stone masonry and precast slabs, through the application of shotcrete in the vertical elements and the application of carbon laminates in the floors. Execution of two new buildings with an area of 3.200 m2: one reinforced concrete building for classrooms and one sports pavilion with a 24m span steel structure ceiling, supported on its edges by precast concrete inclined columns. Services Provided: Final Design and Technical Assistance. Owner: Parque Escolar EPE. Time for Completion: 24 Months. Cost Estimate: 1 500 000€.