Enlargement and seismic strengthening of the existing buildings with an area of 4600m2, through the introduction of peripheral reinforced concrete walls. Execution of 3 new reinforced concrete buildings with an area of 9000m2. One of them has an extension of 100m and columns with variable cross section in height. Replacement of the existing gymnasium steel ceiling for a ceiling with a glued laminated timber lattice structure, with a span length of 25m. Services Provided: Final Design and Technical Assistance. Owner: Parque Escolar EPE. Time for Completion: 24 Months. Cost Estimate: 10 000 000€.