Stabilization of the excavation slopes associated with the accesses to the Baixo Sabor dam and generalized stabilization of the hill at Km 5 + 900 of the Right Bank Access. Solutions based on nailings and reinforced concrete beams supported with permanent anchors. Servies Performed: Basic Design, Detail Design and Technical Assistance to the Works. Owner: EDP.
