Project to convert the existing infrastructure of the Lousã branch line to the BRT - Metrobus solution, including urban integration works and the creation of 5 stations, as well as the adaptation of Coimbra B station for the arrival of the SMM. Coordination of all specialties and design project of the layout, earthworks, drainage, pavements, accessory works, signalization and safety.